Nail the top of the membrane every 15.24cms and install the tiles over the EPDM.
Keep the bottom course of tiles to a minimum of 10.16cm above the roof angle change. To fasten the bottom course of loose tiles tabs to the membrane, lift each tab and apply a 2.54cm long bead of Lap Caulk.